E&P Activities
Production - Hoan Vu
CNV Field Development The first flow of crude oil and wet gas from the CNV Field occurred on 25th July 2008. It was developed with an unmanned platform tied back to the Bach Ho facilities and was the first project in Vietnam to utilise the existing facilities of Bach Ho in order to maximise the life of existing infrastructure and minimise the investment costs. CNV Field Development Scheme
Drilling - Hoan Vu
Six development wells have been drilled with a Jack – Up rig from the Wellhead Platform. Logistics support for the drilling operations was provided from a shore based facility in Vung Tau. With the drilling and suspension of the CNV-6P development well, the initial phase of the development drilling programme of this field has been concluded.Drilling Team working
Subsurface - Hoan Vu
The CNV Field consists of a fractured Granitic Basement Reservoir containing a Volatile Oil. Highly advanced geophysical and geological techniques have been utilized to fully understand this challenging reservoir. Water injection is been used to maintain reservoir pressure throughout field production. The JOC is continuing to analyze the results of well and reservoir performance monitoring and will continue with regular surveillance programs...
Maket Infomation
Link
Statistics
- Online: 37
- Visitors: 447867787