Drilling - Hoan Vu
Six development wells have been drilled with a Jack – Up rig from the Wellhead Platform. Logistics support for the drilling operations was provided from a shore based facility in Vung Tau. With the drilling and suspension of the CNV-6P development well, the initial phase of the development drilling programme of this field has been concluded.