News2011-10-16 23:19:46
Ca Ngu Vang Field production beats the clock
At 10:10 AM – 10 October 2011, the Ca Ngu Vang Field operating by Hoan Vu Joint Operating Company (HVJOC) reached 100 per cent for oil and 106.7 per cent for gas in 2011 production output target. This achievement surpassed 75 days ahead of schedule.
HVJOC strives for achieving a stretch target about 120 per cent for the oil and gas produced from Ca Ngu Vang Field for this year.
Maket Infomation
Link
Statistics
- Online: 34
- Visitors: 440501269