E&P Activities

Production - Hoang Long

TGT Field Development The TGT Field development scheme involves the phasing of production of the reserves from the different Fault block accumulations with 12 months between First Oil from the H1-WHP and First Oil from the H4-WHP.

Drilling - Hoang Long

Drilling - Hoang Long

TGT Field The TGT Field is geographically located in the northern part of Block 16-1 in the Cuu Long Basin approximately 100 km southeast of Vung Tau, 20 km northwest of the Bach Ho Field and 35 km west of the Rang Dong Field.

Subsurface - Hoang Long

Subsurface - Hoang Long

 TGT Field The TGT Field is comprised of numerous separate accumulations some of Early Miocene age and others of Upper Oligocene age. The reservoirs are composed of normally pressured, vertically stacked sand layers with limited distance between production zones and oil-water contacts. Vertical well-bores through the reservoirs are designed to allow the use of technology like sliding sleeves, and the development well trajectories...