News2011-04-07 07:36:29
About Us
Block 16-1 Location Map
The current Contracting Parties in Block 16-1, with their respective interests, are as follows:
PetroVietnam Exploration and Production Corporation (PVEP) (Formerly PVSC) |
: 41.0% |
: 28.5% | |
PTT Exploration and Production Public Company Limited (PTTEP) |
: 28.5% |
OPECO Vietnam (OPECO) |
: 2.0% |
Block Signing Ceremony - 15th November 1999
PTTEP Farm-in Ceremony - February 2008
The company has it's main office in Ho Chi Minh City and Offshore Supply Base Office in Vung Tau and presently has over one hundred employees. The Company's core business is to explore and produce oil and gas in Block 16-1 offshore Vietnam. HLJOC have drilled 20 wells (14 exploration wells and 6 appraisal wells), resulting in discovery of Te Giac Trang (TGT) Field and encouraging results so far in the Te Giac Den (TGD) Discovery.
TGT Field: The TGT initial Reserves Assessment Report was approved in April 2008. The TGT Field has been appraised and was declared commercial on 4th September 2008. Contracting Parties, PetroVietnam and Government approval for the TGT Outline Development was received in September 2008. The Full Development Plan for the Te Giac Trang Field, incorporating the second phase of development was approved by the Partners, PetroVietnam and the Government on 30th March 2011. The Plan is comprised of a Floating, Production, Storage and Off-loading vessel (FPSO), two Well Head Platforms (H1 and H4 areas), and a subsea pipeline system to transport hydrocarbons, gas, export, gas lift and water.
TGT Field Commercial Declaration Celebration
The first flow of crude oil and gas from the Te Giac Trang Field (TGT) H1-WHP area occurred on 22nd August 2011, which marked the completion of the initial phase of the development program
TGT WHP-H1 First Oil at 06:55 AM - 22nd August 2011
TGT WHP-H1 First Oil Ceremony - 16th September 2011
The first flow of crude oil and gas from the Wellhead Platform H4 (WHP-H4) of the Te Giac Trang Field (TGT) occurred on 06 July 2012. The TGT-WHP-H4 is located in the south of the TGT Field in Block 16-1 in the Cuu Long Basin, off the southern coast of Vietnam, approximately 100 km from Vung Tau, 20 km northwest of the Bach Ho Field, and 35 km west of the Rang Dong Field.
Hoang Long JOC Management welcomed the first oil on WHP-H4 at 9:30 am on 6th July 2012
Other news
- First Cut Ceremony for The Te Giac Trang H5-WHP Jacket and Drilling Wellbay Project(2014-04-21 17:22:29)
- Te Giac Trang Field reaches 100th offloading cargo(2013-09-03 09:27:39)
- The Te Giac Trang Field H4 Wellhead Platform First Oil Ceremony(2012-08-21 17:58:16)
- Load-out and Sail-away Ceremony of Te Giac Trang Field WHP H4 Topsides(2012-05-20 22:11:02)
- Te Giac Trang Field Development Project reaching over 11 Million Safety & Quality Manhours(2012-05-03 05:11:51)
Maket Infomation
Link
Statistics
- Online: 44
- Visitors: 447866833